Meaning
Sequential distribution plans organize the recovery of losses from escrow accounts or guarantees based on predefined priority tiers. An indemnity drawdown waterfall dictates the precise order of claims when multiple breaches of representations occur. This structure ensures that low-risk claims do not exhaust the indemnity fund before major tax or environmental liabilities are settled.
The waterfall must be drafted to align with the statutory preferences under Chinese liquidation law. Priority claims like tax liabilities and wage arrears must always be satisfied before general corporate claims can access the funds.
Priority Allocation
The structured sequence allocates the available escrow funds to the highest priority claims first. These usually include unpaid local taxes and employee benefits. Once these primary obligations are discharged, the remaining funds can be applied to secondary breaches.
Claim Procedure
Investors must follow the procedural steps outlined in the waterfall agreement to access the funds. The buyer must first notify the seller and the escrow agent of the claim. If the seller does not contest the claim within fifteen days, the agent releases the funds.
Liability Ceiling
The waterfall is subject to the overall cap on indemnity liabilities specified in the transaction documents. Contractual limits prevent the total claims from exceeding the total value of the escrow account. The arrangement protects the seller from open-ended liability while securing the recovery of the buyer.